projects



NHS office
Complex Installation & Specialist Detailing
Works include the hand-loading of materials to the 5th floor at weekends, with approximately 1,500 boards transported via stair access due to the absence of lift facilities.
The project incorporates a range of specialist elements, including:
- Curved head details
- Fire encasement to structural beams
- Glasroc detailing to external wall abutments
- Suspended grid ceilings
- MF ceilings
PINEWOOD STUDIOS SLOUGH
Acoustic & Specialist Ceiling Solutions
A three-storey refurbishment project incorporang a range of specialist internal finishes, including:
- Acoustic stud wall systems
- Suspended acoustic ceiling tiles
- Metal ceiling tiles
- Dot-and-dab wall systems
- MF ceilings





school - central london
Specialist Wall & Ceiling Systems
The project incorporates 9m-high jumbo stud wall systems within the sports hall, alongside internal stud parons throughout the building.
Specialist ceiling soluons include:
- Acoustic baffles
- Suspended ceilings
- GypLyner wall systems
- Associated specialist finishes
- MF ceilings
GRAFTON STREET LONDON
Central London Residential to Office Refurbishment
A five-storey refurbishment, delivered within a complex and constrained site environment.
The works include:
- Specialist shaft wall systems
- Overboarding
- Internal stud partitions
- Structural steel encasements
- High-quality skim plaster finish





NHS - London Hospital
This project involves the refurbishment of the MAU unit within a busy Central London hospital.
The works include:
- Metal stud partitions
- Plasterboard walls
- Drylining
- Suspended ceilings
YOUTH CENTRE - london
New build Youth Zone for young people , including a sports hall, fitness suite and climbing wall.
This fermacell project includes:
- Internal partitions
- Suspended ceilings
- Vaper control layer
- Acoustic baffle ceilings




© Copyright 2026 | All Right Reserved